Casas Adobes Epoxy Pros logoCasas Adobes Epoxy ProsEpoxy Flooring · Casas Adobes, AZ
Industrial Floor Coatings photo

Casas Adobes Epoxy Pros

Industrial Floor Coatings in Casas Adobes, AZ

Industrial floor coatings in Casas Adobes, AZ resist chemicals, heat, and heavy equipment wear. Multi-layer systems, free estimates available.

  • 15+ Years local experience
  • 500+ Projects completed
  • Licensed & Insured

Serving Casas Adobes and nearby communities.

Chemical spills, heat near equipment, and constant heavy loads wear down a bare slab faster than almost any other environment. Casas Adobes Epoxy Pros installs industrial floor coatings built for warehouses, process areas, and manufacturing floors that take that kind of daily abuse.

A standard epoxy coating isn't built for forklift traffic, acid exposure, or a floor that sits near equipment running hot all shift. Industrial work calls for a different approach. Thicker build, chemical-resistant resins, and prep aggressive enough to pull out contamination an ordinary grind would leave behind. We walk the floor first, map out the zones that see the worst exposure, and build the system around what that specific area actually deals with day to day.

What's included

What's included with Industrial Floor Coatings

Typically included: Optional: Customer prep:

  • Process area evaluation and exposure mapping
  • Aggressive surface prep (shot blast or grind)
  • Chemical-resistant primer and multi-layer build-up
  • Secondary containment liners and coved detailing
  • Static-dissipative coating for sensitive areas
  • Heat-resistant topcoat near equipment or process lines
  • Clear equipment and stock from the work zone ahead of schedule
  • Flag any chemicals or processes specific to that area
  • Confirm shift schedule or shutdown window for the crew

How it works

Our process

  1. Process Area Evaluation photo
    Step 1

    Process Area Evaluation

    Each zone is assessed for chemical exposure, heat, and heavy equipment use.

  2. Aggressive Surface Prep photo
    Step 2

    Aggressive Surface Prep

    Shot blasting or grinding removes contamination and old coatings thoroughly.

  3. Chemical-Resistant Primer photo
    Step 3

    Chemical-Resistant Primer

    A specialized primer is applied to resist harsh industrial substances.

  4. Multi-Layer Build-Up photo
    Step 4

    Multi-Layer Build-Up

    Several coating layers are applied to achieve required thickness and strength.

  5. Containment Area Detailing photo
    Step 5

    Containment Area Detailing

    Coved bases and containment zones are detailed for spill control.

  6. Extended Cure & Testing photo
    Step 6

    Extended Cure & Testing

    The system is cured fully and tested before resuming operations.

Materials

Materials and methods we use

  • Chemical-Resistant Epoxy photo

    Chemical-Resistant Epoxy

    A formula engineered to withstand acids, solvents, and industrial chemicals.

  • Heat-Resistant Coating photo

    Heat-Resistant Coating

    A coating designed to handle elevated temperatures near equipment or processes.

  • Secondary Containment Liner photo

    Secondary Containment Liner

    A liner system helps contain spills within designated process areas.

  • Novolac Epoxy Blend photo

    Novolac Epoxy Blend

    A high-performance resin blend offers superior chemical resistance.

  • Static-Dissipative Coating photo

    Static-Dissipative Coating

    A coating designed to safely dissipate static electricity in sensitive areas.

  • Heavy Traffic Topcoat photo

    Heavy Traffic Topcoat

    A topcoat formulated for constant exposure to heavy machinery and loads.

Timeline

How long does a an industrial floor coating take?

Downtime matters as much as the install itself, so scheduling usually works around a shutdown window or a slow shift.

  1. 01

    Site walk and evaluation

    same day

    .

  2. 02

    Surface prep (shot blast/grind)

    1–2 days

    .

  3. 03

    Primer and base build-up

    1–2 days

    .

  4. 04

    Topcoat and containment detailing

    1 day

    .

  5. 05

    Cure before full load

    3–7 days

    .

Need a schedule that fits?

Get a Free Estimate

Codes & permits

Permits and codes for Industrial Floor Coatings

Casas Adobes sits in unincorporated Pima County, so any permitting runs through the county rather than a city office. Confirm specifics with your facility manager before scheduling.

Typically needs a permitOften no permit
Structural slab repair or replacementResurfacing an existing sound industrial slab
New containment construction tied to code reviewStandard chemical-resistant coating application
Work affecting fire or chemical storage complianceContainment detailing on existing coved bases

DIY vs pro

DIY vs hiring a pro for Industrial Floor Coatings

DIYHire a pro
Not realistic for an active process floor or chemical storage areaShot blasting and grinding equipment that actually opens an industrial slab
Hardware-store coatings aren't rated for industrial chemical exposureCoatings engineered for the specific chemicals and heat on site
No shot-blast equipment or containment detailing available at that scaleContainment detailing done to protect adjacent areas from a spill

When to call

When to call for Industrial Floor Coatings

Call Casas Adobes Epoxy Pros at (928) 384-3434 for a free estimate on your facility, or reach out through Contact. More: Home

  • Existing coating is pitting, peeling, or chemically degraded
  • Spills aren't staying contained within the process area
  • Planning a new process line or equipment layout
  • Floor shows static discharge issues in sensitive zones

Ask about Industrial Floor Coatings

Tell us about the project and how to reach you.

Call (928) 384-3434